RFQ # 220127055001 - Water Distribution System Master Plan Update

The City intends to contract with one qualified firm to provide engineering services to update its 2017 Water Distribution System Master Plan. The City operates a public water system with over 650 miles of distribution piping that serves a population of over 72,000 with ~32,000 water connections. The scope of services includes, but is not limited to the following:

  • Update to water demand projections within the future planning period.
  • Update the City’s Innovyze InfoWater hydraulic model.
  • Identification and update of existing and future deficiencies in the distribution system.
  • Update and prioritization of the existing water distribution system capital improvement plan.

SOQs shall be submitted in PDF format via e-mail. Submissions must be emailed to Adam Steurer, Utilities Engineer, at asteurer@hvlnc.gov by 1:00 PM local time on July 14, 2022 SOQs received after this deadline will not be considered. Questions regarding this request should be directed to Adam Steurer (email only) and will be accepted until July 7, 2022. Answers to questions will be addressed via addenda posted on the City’s website.