The Hendersonville City Council unanimously adopted a Resolution to Reduce Sanitary Sewer Overflows (PDF, 855 KB)(opens in a new tab) (SSOs) at its April 2020 meeting. SSOs are the release of untreated or partially treated wastewater from a sewer system, which contribute to the pollution of streams and rivers. SSOs occur from time to time in all sewer collection systems. However, frequent and repetitive SSOs have occurred in portions of the City’s sewer system. SSOs can have many different causes including: pipe blockages, pipe breaks, inadequate treatment and/or pipe capacity, power failures, excessive infiltration and inflow, and severe natural conditions.
The resolution (PDF, 855 KB)(opens in a new tab) illustrates the City’s strong commitment to reducing SSOs from its sanitary sewer system and outlines a plan of action to achieve this goal. The action plan, comprised of six items/projects planned over the next two years, is summarized below:

Smoke testing identifies storm drain connections and/or other defects that contribute to I/I by forcing smoke into sewer pipes. Smoke escapes out of the sewer pipes at connections with storm drains or cracks in the pipe and is visible to inspection crews. Once found, these defects are repaired. Often times these defects are identified on private property and it is the property ownerâs responsibility to complete the associated repair work.

City staff perform CCTV inspection of underground sewer pipes

City staff install portable sewer flow tracking device

The City’s sewer collection system master plan identified sewer basin 6 having the second highest I/I rate, behind basin 5. The City plans to conduct a micromonitoring study, similar to the basin 5 study, within basin 6 by December 31, 2020.
The primary goal of the master plan will be to identify improvements and expansions to the City's treatment facility over a 20-year planning period (2040) to ensure that the facility is reliably maintained and expanded to meet projected growth demands in conjunction with the recently completed sanitary sewer collection system master plan. The plan includes but is not limited to: treatment process evaluation, equalization basin preliminary engineering evaluation, and capital improvement project prioritization/recommendation.

City of Hendersonville Wastewater Treatment Facility
The Clear Creek Interceptor Replacement Project will replace approximately 3,000 linear feet of existing 18-inch sewer pipe with 30-inch sewer pipe along Clear Creek. This project was identified in the City’s sewer collection system master plan as being under-sized and has been the cause of several recent SSOs. The project is under construction in 2021.
The Mud Creek Interceptor Replacement Project will replace approximately 10,000 linear feet of existing 24-inch and 12-inch diameter aging sewer pipes with 36-inch and 24-inch sewer pipes along Mud Creek. This project was identified in the City’s sewer collection system master plan as being under-sized and has been the cause of many recent SSOs. The City plans to begin construction of this project by December 31, 2021.


What YOU Can Do!
There are things you can do as a sewer customer to help reduce SSOs!
- Cease the grease (PDF, 374 KB). Do not pour fat, oils, or grease (also referred to as FOG) down the drain. These compounds can clog sewer pipes, cause SSOs, and can even clog your private sewer service line causing back-ups into your home or business.
- Do not flush “flushable wipes” or “baby wipes”. These items can cause blockages in pipes and clog sewer pumps causing SSOs. Only flush the 3-Ps – poo, pee and paper (toilet paper). Refer to The Importance of Protecting Our Sanitary Sewer Infrastructure for more information.
- Report issues (828) 697-3073) of stormwater entering sewer or storm drains connected to sewer to the City. Excessive stormwater entering sewer pipes takes up capacity needed to convey and treat sewer and can cause SSOs.